Transfer technology: Plant linking

Brief outline

Transport of workpiece carriers for the linking of different equipment as well as a removal and introduction.

Objektive

Workpiece carriers of type TS5 (Bosch Rexroth) have to be transported, defective components have to be removed, and the revised components must be returned to circulation.

Solution

The transport system is in a U-shape and has the Option to expand for longer stations in the longer inlet area. All workpiece carriers sto with the previous test results decide on the further Course. The faulty parts are directed straight to a test. All good parts remain in circulation and drive ove a switch and a merge to the next station. During the merge, further workpiece carriers can be fed into circulation.

Contact Person/s