Skip to main content
Electronics production: 8-fold test station

Brief description

A test station for control devices is to be implemented in order to test control devices for functionality An exam takes 128s. 

Target

The test station should achieve a cycle time of 16s/product. A second station cannot be provided due to lack of space

Solution

Construction of an 8-fold test station from a flexible profile system including separate process and test control. The test cassettes are designed as exchangeable parts, which means that many different product variants can be tested.